Upper Kotmale Dam

The Upper Kotmale Dam (also known as the Upper Kotmale Hydropower Project, or UKHP) is a large hydroelectric dam currently under construction in Talawakele, within the Nuwara Eliya District, in the Central Province of Sri Lanka. Once completed in late 2011, the facility will be the third largest hydroelectric dam in the country.

History

The project was initially planned in 1968 by the local authorities, before the Government of Japan funded a study between 1985 and 1987 to further examine the hydroelectric potential in the upper reaches of Kotmale River. The feasibility study included five sites and eight alternative development schemes, and concluded with two sites which were more technically and economically feasible.

The two sites were a conventional type at Caledonia, and a run-of-the-river type at Talawakele. The project at Caledonia involved the displacement of over 2,700 families and inundation of large areas of land used for tea plantations, and thus the Caledonia site was dropped. Further funding was then provided by Japan for the engineering study, which included a review of the feasibility study, selection of an optimal development plan, development of the detailed design, and the preparation of tender documents and an environmental impact assessment report.

The environmental impact assessment report was completed in September 1994, with the final design report completed in March 1995. The environmental assessment identified key issues associated with the project, which includes impact on St. Clair's Falls aesthetics due to stream flow reductions, social impacts due to resettlement of affected people, possible effects on ground water due to tunnelling, impacts on downstream water uses due to de-watering of streams, and impacts on biodiversity. These impacts led large delays in project development.

As per the National Environmental Act of 1998, the environmental clearance was then granted to the project. The project initially faced several objections, before being officially permitted by courts of law. Construction work on the project then began in 2006, and is expected to be completed by the end of 2011.

Construction and development

This project is estimated to cost a total of up to Rs.44 billion, of which Rs.5.931 billion was funded by the Ceylon Electricity Board, and ¥33.265 billion by the Japan Bank for International Cooperation. The entire project covers an area of approximately 540 km2 (208 sq mi), and is developed in five phases:

  • Phase 1: Site preparations, construction of employers and workers living quarters, construction of access roads, and relocation of affected people.
  • Phase 2: All key civil engineering works, such as dam building, etc. This takes up 50% of the project cost.
  • Phase 3: Hydro-mechanical works such as construction of spillways, penstocks, intake gates, etc.
  • Phase 4: Electro-mechanical works such as generation installations, construction of the switchyard, fire fighting system, communication system, etc.
  • Phase 5: Construction of the 18 km (11 mi) 220-kV double-circuit power transmission line.

A total of 2,250 construction workers are employed at the site, of which 2,100 are locals, and 150 are foreign.

Dam, reservoir, tunnel, and powerhouse

The gravity dam measures 35.5 m (116.5 ft) tall, and 180 m (591 ft) wide, impounding the Kotmale River and creating the Upper Kotmale Reservoir. Once filled, the reservoir will have a surface area of 250,000 m2 (2,700,000 sq ft) with an average storage capacity of 800,000 m3 (28,000,000 cu ft). The minimum and maximum operating water levels are 1,190 m (3,904 ft) and 1,194 m (3,917 ft) AMSL respectively, while the tailwater level is 703 m (2,306 ft) AMSL. Water from the reservoir will be used for both irrigation development and hydroelectric power generation.

The 4.5–5.2 m (14.8–17.1 ft) diameter, 12.89 km (8.0 mi) long Upper Kotmale Tunnel, the longest excavated tunnel in Sri Lanka, will be used to deliver the water to the powerhouse. The tunnel begins at the dam site, and stretches north at a distance of approximately 7.4 km (4.6 mi) towards Pundaluoya, before stretching a further 5.5 km (3.4 mi) north-west towards Kumbaloluwa and ending up at its powerhouse at the Kotmale River near Niyamgamdora, at approximately , 2 km (1.2 mi) downstream of the confluence of Pundal River and the Kotmale River. Construction on the tunnel was completed and ceremonially opened by President Mahinda Rajapaksa on the 4th of November, 2010.

The powerhouse measures 66.3 m (217.5 ft) long, 18.8 m (61.7 ft) wide, and 36.5 m (119.8 ft) tall, and is located underground at Niyamgamdora. It has installed electrical capacity of 150 MW from two 75 MW turbines, capable of producing up to 409 GWh of power annually. Water arrives at the powerhouse from the dam via the 12.89 km (8.0 mi) long Upper Kotmale Tunnel, which then feeds the 793 m (2,602 ft) penstock. The initial 745 m (2,444 ft) of the penstock is single-lane, while the latter 48 m (157 ft) splits into two lanes, feeding the two 75 MW generators respectively.

The powerhouse consists of the two three-phase 77 MW, 80,000 kVA vertical-axis turbines and generators, two three-phase transformers, and a 220kV Gas Insulator Switchgear (GIS) substation. An outdoor switchyard measuring 36.5 m (119.8 ft) by 130 m (426.5 ft) would then connect the powerhouse to the national grid via an 18 km (11 mi) long 220-kV double-circuit transmission line which connects the switchyard to the national grid at the existing Kotmale Substation at . Two megawatts from each of the generators will be utilized to run the Upper Kotmale facility itself, thus the net production will be 150 MW instead of 154 MW.

Social and environmental impact

The construction of the dam, tunnel, and powerhouse, required the relocation of families from 495 houses. New homes were built away from the site with access to vital facilities such as water and power. The relocated families are provided with concessionary loans to start new self-employment ventures, while additional facilities such as the Talawakele Central College, places of worship, a cinema hall, a library, and a community centre, are being established.

Similar most other dam's impacts on rivers around the world, the Upper Kotmale Dam will periodically stop the St. Clair's Falls, located 2.2 km (1.4 mi) downstream of the dam, and a further 2.9 km (1.8 mi) of the Kotmale River downstream of St. Clairs Falls, before the river is restored by water from the Devon River, the river forming the picturesque Devon Falls. As ordered by the Government Extraordinary, the St. Clair's waterfall will maintain a continuous flow of 47,250 m3 (1,668,618 cu ft) of water for 10 hours and 30 minutes daily, between sunrise and sunset.

See also

  • Energy in Sri Lanka
  • Kotmale Dam
  • List of dams and reservoirs in Sri Lanka
  • List of power stations in Sri Lanka
Listed in the following categories:
Post a comment
Tips & Hints
Arrange By:
Sahan Serasinghe
19 January 2016
You won't be allowed take your vehicle on to the dam unless you have permission. Take a walk. Thank me later ;)
Amila De Silva
5 April 2016
A dam built under accelerated Mahaweli project using a SIDA loan. You can see the submerged ruins of a temple when the water levels are very low.
Amila De Silva
5 April 2016
A dam built under accelerated Mahaweli project under SIDA loan. You can see the submerged ruins of a temple when the water levels are very low.
Shehan Randew
4 August 2015
The view is amazing.
Wanshanath Samarakoon
24 December 2014
Dam in mist
Load more comments
foursquare.com
7.1/10
31,633 people have been here
Map
0.8km from Harangala Road, Sri Lanka Get directions

Kotmale Dam on Foursquare

Upper Kotmale Dam on Facebook

Hotels nearby

See all hotels See all
GLENLOCH TEA FACTORY HOTEL

starting $43

Ramboda Villa

starting $170

The Heritage Pussellawa Hotel

starting $32

Tearamb Holiday Bungalow Nuwara Eliya

starting $115

Aruna

starting $100

The View at Glenloch - Home Stay

starting $35

Recommended sights nearby

See all See all
Add to wishlist
I've been here
Visited
Ramboda Falls

Ramboda Falls is 109m high and 11th highest waterfall in Sri Lanka and

Add to wishlist
I've been here
Visited
Devon Falls

Devon Falls is a waterfall in Sri Lanka, situated 6 km west of

Add to wishlist
I've been here
Visited
St. Clair's Falls

St. Clair's Falls is one the widest waterfall in Sri Lanka.('Bomburu

Add to wishlist
I've been here
Visited
St.Clairs Falls

St.Clair's Falls is the widest waterfall in Sri Lanka hence called

Add to wishlist
I've been here
Visited
Aberdeen, Sri Lanka

Aberdeen Falls is a waterfall situated in Aberdeen tea estate. The

Add to wishlist
I've been here
Visited
Laxapana Falls

Laxapana Falls is 126m high and the 8th highest waterfall in Sri Lanka

Add to wishlist
I've been here
Visited
Temple of the Tooth

The Sri Dalada Maligawa or The Temple of the Sacred Tooth Relic is a

Add to wishlist
I've been here
Visited
Royal Palace of Kandy

The Royal Palace of Kandy in Kandy, is the last royal residence of the

Similar tourist attractions

See all See all
Add to wishlist
I've been here
Visited
Hoover Dam

Hoover Dam, once known as Boulder Dam, is a concrete arch-gravity dam

Add to wishlist
I've been here
Visited
Cahora Bassa

The Cahora Bassa lake is Africa's fourth-largest artificial lake,

Add to wishlist
I've been here
Visited
Aswan Dam

Aswan Dam refers to two dams, both located near Aswan, Egypt. Most

Add to wishlist
I've been here
Visited
Orlík Dam

The Orlík Dam (Czech: Vodní nádrž Orlík) is the largest hydr

Add to wishlist
I've been here
Visited
Tokuyama Dam

The Tokuyama Dam is a future hydroelectric plant in Japan.

See all similar places