Mariinsky Theatre Second Stage

The Mariinsky Theater Second Stage is the second part of a theatre complex which is made up of the original 1860 Mariinsky Theatre and the 2007 Mariinsky Theatre Concert Hall. The Second Stage has been completed and a gala concert celebrating the opening, and featuring such luminaries as Plácido Domingo, Rene Pape, Anna Netrebko, and many others, was presented on 2 May 2013. The concert also celebrated the sixtieth birthday of musical director Valery Gergiev.

The post-modernist French architect Dominique Perrault won a much-publicised contest for his design for a new home for the theatre, which is to be located adjacent to the current building. At the same time, the historic original structure had been due to undergo a complete renovation and this was planned to begin in the Autumn 2006.

After seeing projected costs rise to $244 million (U.S.) from $100 million, the Russian government announced in November 2008 that it was killing the Perrault plan. The Russian Prime Minister Vladimir Putin overruled both Valery Gergiev (the artistic director of the Mariinsky Theatre) and the Minister for Culture, announcing in early June 2009 that there would be a new competition to solicit proposals. A total of 15 proposals were received, a list which was then shortened to five. "We wanted to give the impression that although we were in a tense situation and we didn't want to delay forever ... no one felt like it was the best way to simply sit down quietly and say, 'You are a great architect; just come and do it,'" Mr. Gergiev explained.[]

With a budget of €295-million (about US $452-million), all of which will be paid by the Russian government with a completion date of no later than December 2011, the Canadian firm, Diamond and Schmitt Architects, prevailed over four other finalists, one of which came from Germany and three from Russia. The building has been hyped as "Russia's most important building project in 70 years". As noted by Mr. Diamond, (it is) "the first major opera house to be built in Russia since the Czars."

Building construction history

At the end of the design competition for The Second Stage of the Mariinsky Theater in 2003, 11 proposals had been received. The winner was well-known French architect Dominique Perrault with «a gold cocoon» (an external cover of a building of the wrong form from glass and aluminium).

By 2005 experts discovered that detailed proposals presented by the competition winner did not meet Russian building codes. They failed to include sections relating to water supply, drainage, and ventilation. The result was that in 2007, FGU ("Northwest management on building, reconstruction and restorations") terminated the contract with the French architectural firm.

However, in June of that year the new general contractor, "Joint-Stock Company "NPO" Georeconstruction-fundamentproekt", in a short space of time removed all 286 obstacles shown on the working drawings of Perrault. As had become clear, the winning design was far from that presented when it won the international competition. In particular, it was necessary to make changes - based on the Saint Petersburg climate - in order to strengthen load-bearing structures above which the gold cuplola would be located. As a result, the building would not look so open to the air. By July, the project had been simplified as much as possible, and it was determined that it would "not intrude so much into the existing city environment", Gergiev said. The height of the building was reduced and other elements were also reconsidered.

In 2008 the foundation work for the building of the theatre continued, but by April, it was found that the consistency of the soil under the construction area was unpredictable. (Later builders have compared the properties of the soil to those of sour cream). In order to overcome these problems, the builders strengthened the consistency of the soil to a depth of 12 to 14 metres and, as a result, cost estimates had to be increased. Also, the builders informed the authorities that the construction of a glass dome, as planned by Dominique Perrault's architectural firm, was impossible. Therefore that part of the project would have to be changed.

By June, the project had a new local architect partner, KB ViPS Architects, a firm working on high-rise and underground construction, and it became the third firm to work on the building.

During 2009 foundation work was completed. Valery Gutovsky, the director of KB ViPS Architects, a specialist in high-rise and underground construction, became the new head of construction for the project., and on 29 May Vladimir Putin held a meeting at which he confirmed that the building would be completed in 2011 at the cost estimated in the published budget.

On 28 July the result of the last competition was announced, the winner being KB ViPS Architects, a specialist in high-rise and underground construction. Within a month, a contract was signed with that company and construction proceeded, with some parts of the building then reaching a height 5 metres. At the same time, according to Valery Gutovsky, the project was to be submitted to the town-planning council of St. Petersburg in October 2009 and to Glavgosekspertiza ("The General State Expert Review Department of the State Committee for Construction, Housing and Utilities" which was authorized to perform the state expert review of all projects by spring 2010. The construction cost was estimated at 8.5 billion roubles.

Architecture and interior

The theater has been described as too modern and not modern enough, too ambitious and too restrained. The theater was built on a surface of 567,700 square foot, has 2000 seats and facilities for 2,500 staff members. The last architect Diamond Schmitt Architects finished the design by creating an onyx wall which is visible from outside and illuminated. The lobby has a modern style with several straight and spiral staircases with glass balustrades. For the glass stairs and balustrades Diamond Schmitt Architects co-operated with EeStairs as well as some other individual construction professionals during the consultation process for the new theatre. The main hall is round shaped, has curved walls and three levels of balconies.

References

External links

Listed in the following categories:
Post a comment
Tips & Hints
Arrange By:
Leandros Nikolaidis
8 November 2017
A huge and magnificent modern theatre, no less than such a city deserves. ( personally I like the old Mariinsky more, just cause I like classic. But this is a great building!)
Shaun Hunter
15 July 2013
Fantastic venue. At time of posting this place is cash only. VTB Cashpoint in old Marinski but likely to be out of cash. Another cashpoint across the road from entrance.
Eugene Kim
29 June 2018
Architecturally stunning, modern opera house with great acoustics and sightlines. I recommend stalls section if you can afford (close to the action), but the balconies are still good seats.
Andrés Inglés
9 November 2013
Modern theatre stunning against the backdrop of historical SPB. Ballet (Cinderella) was fresh and also modern. Amazing experience, a must do in SPB.
Aliona Fedyakshina
16 December 2015
Good acoustics, you can see the scene from every corner of odeum. You better get tickets a long time before performance.
Frédéric Meire
26 June 2018
A must do when in St Petersburg. Drinks are to be paid cash (rouble) only!
Load more comments
foursquare.com
8.8/10
Кирилл С, Aleksandr Vinokurov and 70,171 more people have been here
Map
Mariinskiy teatr, Teatralnaya pl., 1, Sankt-Peterburg, Russia, 190000 Get directions
Thu 5:00 PM–10:00 PM
Fri-Sat 4:00 PM–10:00 PM
Sun 11:00 AM–2:00 PM
Mon-Tue 6:00 PM–9:00 PM

Mariinsky Theatre II on Foursquare

Mariinsky Theatre Second Stage on Facebook

Hotels nearby

See all hotels See all
STN Apartments by the Hermitage

starting $43

Sonata at Nevsky Hotel

starting $72

Small Central Studio near Ermitasce

starting $56

Modern Studio3 old center near Hermitasce

starting $56

Sonata at Nevsky 5

starting $91

Nevsky 3 Guest House

starting $57

Recommended sights nearby

See all See all
Add to wishlist
I've been here
Visited
Mariinsky Theatre

The Mariinsky Theatre (Russian: Мариинский театр, Mariinskiy Tea

Add to wishlist
I've been here
Visited
Theatre Square (Saint Petersburg)

Theatre Square or Teatralnaya Square (Russian: Театральная площадь, T

Add to wishlist
I've been here
Visited
Saint Petersburg Conservatory

The N.A. Rimsky-Korsakov Saint Petersburg State Conservatory (Russian:

Add to wishlist
I've been here
Visited
Grand Choral Synagogue

The Grand Choral Synagogue of St. Petersburg (Russian:

Add to wishlist
I've been here
Visited
Potseluev Bridge

}}The Potseluev Bridge (Russian: Поцелуев мост, literally Bridge of K

Add to wishlist
I've been here
Visited
St. Nicholas Naval Cathedral

St. Nicholas Naval Cathedral (Никольский морской собор, Nikolskiy

Add to wishlist
I've been here
Visited
Bridge of Four Lions

Bridge of Four Lions (Russian: Львиный мост, Мост о четырех львах)

Add to wishlist
I've been here
Visited
Исидоровская церковь

Свято-Исидо́ровская це́рковь — приходский православный хра

Similar tourist attractions

See all See all
Add to wishlist
I've been here
Visited
Pantages Theatre (Hollywood)

The Hollywood Pantages Theatre, formerly known as RKO Pantages

Add to wishlist
I've been here
Visited
Gershwin Theatre

The Gershwin Theatre is a Broadway theatre located at 222 West 51st

Add to wishlist
I've been here
Visited
Royal National Theatre

The Royal National Theatre (generally known as the National Theatre)

Add to wishlist
I've been here
Visited
Theatro da Paz

The Theatro Nossa Senhora da Paz theater, or simply Theatro da Paz

Add to wishlist
I've been here
Visited
Teatro Guaíra

The Teatro Guaíra Cultural Centre is a state-run cultural

See all similar places